General Data | ||||
---|---|---|---|---|
Academic program | ECAM ENGINEERING PROGRAM | :
|
||
Type d'EC | Classes | |||
|
Status :
|
Period :
Semester 5 |
Education language :
English |
Learning Outcomes |
---|
• To be able to effectively use a scientific problem-solving methodology • From the bill of material and the manufacturing range, be able to calculate a cost price and have fully understood the structure (Material + Labor) • Having understood and integrated the MRP2 system with its 3 levels, be able to calculate a load in order to define a workforce and make supplies of components and raw materials. |
Content |
---|
• Schools of the organization • PDCA, "What? who? where? when? How, Why? How much?" , PARETO, 5M, 5 Why & Action Plan. • Industrial Planning courses 1, 2 & 3 • Technical Database (Bill Of Materials and Ranges) • Hourly rate, costing • The MRP2 system with its 3 levels: S&OP (Sales & Operations Planning), determination of the MPS (Master Production Schedule), load calculations and introduction to MRP (Materials Requirements Planning). Link with capacity planning. • Lean Management • Notions around TPM: OEE, OOE, 6 major losses |
Pre-requisites / co-requisites |
---|
To have a high level knowledge of the organization of the industrial company and to have a work placement in a company |
Bibliography |
---|
Nothing to report |
Assessment(s) | |||
---|---|---|---|
N° | Nature | Coefficient | Observable objectives |
1 | Midterm To check that the student is able to use the concepts and tools taught to solve a new problem. | 35 | Written exam |
2 | Continuous Assessment | 30 | |
3 | Final | 35 | Written or oral exam |