General Data | ||||
---|---|---|---|---|
Academic program | ECAM LaSalle Mechanical and Electrical Engineering Programme | Module Manager(s) :
BRAILLY Elsa |
||
EC Type : Lectures | IP Project Management And Technical Requirements (LIIEEng08IPProjectManagementandtechnicalrequir) | |||
Tutorials : 2h00 Lectures : 9h00 Project : 6h00 Total duration: 17 |
Status
|
Period
Semester 8 |
Teaching language :
English |
General objectives |
---|
The Innovation Project is a multidisciplinary teamwork experience where students from various engineering fields collaborate on a product innovation. Spanning two semesters, the project follows all phases of an R&D process—from opportunity analysis to technical development. Technical Product Architecture Selection: Identify and justify the chosen Technical Product Architecture based on evaluation criteria and alignment with project specifications. Subsystem Analysis: Break down the project into subsystems, mapping out dependencies and interactions. Present and provide preliminary sizing or estimation for each subsystem with key metrics. Project Planning: Develop a work plan that includes task breakdowns, role assignments, a timeline with intermediate deadlines, and team coordination strategies. Risk Analysis: Identify potential risks and outline basic mitigation strategies to manage and monitor them throughout the project. |
Assessment(s) | |||
---|---|---|---|
N° | Nature | Coefficient | Observable objectives |
1 | Technical Product Architecture Subsystem Analysis Project Planning Risk Analysis |
80 | TPA & Project Management Plan |
2 | Ability to summarize the work done for the TPA & Project Management Plan deliverable | 20 | Executive summary of the TPA & Project Management Plan |
3 | 1 | Written Assignement |