General Engineering Program
5-year combined undergraduate / graduate Engineering programs
General Data
Academic program General Engineering Program :
Type d'EC Classes
Lectures : 6h00
Tutorials : 6h00
Total duration : 12h00
Status :
Period :
SEMESTER 6
Education language :
French
Learning Outcomes
"Choosing the inventory management method most suited to a specific context within the framework of the MRP system.
Understanding and integrating the complementarity of push flows (MRP2) and pull flows (KANBAN), be able to carry out a VSM (Value Score Mapping)
Carrying out a workstation analysis and making simple recommendations to improve overall performance (Economic, Social & Environmental)
"
Content
"• The Stock function
Zero unnecessary stock, calculation of safety stock, supply policy: Variable date / Fixed Qty, Fixed date / Fixed Qty, Fixed Qty / Fixed date, Fixed date / Variable Qty, Noria, Variable date / Variable Qty.
• VSM (value Score Mapping)
Takt time, Lead Time, cycle time.
• The KANBAN method (drawn flows)
• Factory locations
• Time determination & ergonomics standard
• Workstation analysis methodology & workstation robotization elements.
"
Pre-requisites / co-requisites
Industrial Organization 1
Bibliography
N/A
Assessment(s)
Nature Coefficient Observable objectives
1Written exam1
2Written exam1